DALLAS ISD - ORG 220 MARK TWAIN SCHOOL FOR TAG

COMPETITIVE SEALED PROPOSAL FOR DALLAS ISD - ORG 220 MARK TWAIN SCHOOL FOR TAG

Status

Accepting Bids

Prebid Date9/9/24 10:00am

Bid Date10/2/24 2:00pm

Company & Contacts

Dallas ISD 2020 Bond Program
Dallas ISD - Procurement Services  
ProcurementCS@dallasisd.org

Location

724 GREEN COVE LANE, DALLAS TX 75232

All digital files included with purchase of complete printed set via file transfer. Specs separated by section and plans by sheet names.

Half Size Available upon Request

NOTICE: INVITATION TO BID

Scope of Work. The Work consists of:

ORG 220 – MARK TWAIN SCHOOL FOR THE TALENTED AND GIFTED - RENOVATION - Project consists

of the following:

1. Provide security updates including cameras, card access readers, and door contacts.

2. Provide secure front vestibule.

3. Replace exterior waterproofing/sealant joints.

4. Replace fire alarm system.

5. Replace exterior lights with LED lighting and controls.

6. Partial Interior LED light replacement and controls.

7. Replace teaching surfaces at each classroom.

8. Provide new marquee sign located at front entry.

9. Remove and replace concrete pavement and sidewalks.

10. Mechanical/HVAC improvements include new split system, central station, rooftop and fan coil units, water pumps and piping, VAV boxes, ductwork, and controls on pumps and units.

11. Plumbing improvements include grease waste and waste piping replacement, new hot water heater

and hose replacement.

12. Provide/replace IDF/MDF air conditioning.

13. Replace Sanitary Sewer Lines

14. Update and relocate Nurse Clinic

Total Estimated Construction Budget (CCL + Allowances) for CSP 207459 $5,948,529.30

PRE-BID & LOCATION:

A pre-proposal meeting will be held at on 09/09/24 via Zoom for all interested parties. This meeting is not mandatory, but information discussed will be extremely helpful in preparation of the proposal.

Join Zoom Meeting

https://us05web.zoom.us/j/82896540881?pwd=Gn8ySjC0gWiduwuHtuI4BcTiaxLlfE.1

Meeting ID: 828 9654 0881

Passcode: as1s2b

All general contractors and sub-contractors are encouraged to attend this meeting. Contractors will meet A/E(s) and PM at the school to start site tours. The first site tour will take place immediately following the pre-proposal.

The following is the schedule for each site tour:

Mark Twain School for the Talented and Gifted, 09/09/24, 4:00pm, 724 Green Cove Lane, Dallas, TX 75232

BID-DATE & LOCATION:

All Construction Services procurements must be physically delivered to the Construction Services office, at the Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.

Completed CSP Package Part 1-A, 1-B and 1-C are due on Wednesday, 10/02/24 at 2:00 PM (local time).

Completed CSP Package Part 2 is due on Thursday, 10/03/24 at 3:00 PM (local time).

Any materials received after the respective closing dates / times will not be considered. The District will open and read the names of the proposers and prices submitted in responsive CSPs beginning at 3:00 P.M. local time upon submittal of Part 2 of the Package, via zoom at Dallas ISD Construction Services, Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231.

Join Zoom Meeting

https://us05web.zoom.us/j/83481812712?pwd=TWF5p5AUZyA4q9s6sYKZkiKRbn5vmA.1

Meeting ID: 834 8181 2712

Passcode: tGw7Yv

No further information will be officially released until after the date the Agenda is publicized for the Board of Trustees briefing.

The right is reserved to reject any or all bids, proposals, CSPs or statements of qualification and to waive technicalities.

The Dallas Independent School District is committed to the ideals of equal opportunity in all its business endeavors.

The Dallas Independent School District’s Construction Services projects have a 30% Minority and Women-Owned Business Enterprise (M/WBE) construction goal.

RUN TWO TIMES ONLY AS FOLLOWS:

08/25/24 and 09/01/24

OWNER
Dallas ISD Procurement Services c/o Bond/Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 North Central Expressway, Suite 800
Dallas, TX 75231

OWNER’S PROJECT MANAGER (PM):
Robert Spicer, Project Manager
Dallas Independent School District
Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 N. Central Expressway Suite 800
Dallas, TX 75231
Phone: 817-308-2916
E-mail: C113808@Dallasisd.org

ARCHITECT/ENGINEER FIRM (A/E)
JMA Johnson, LLC
13355 Noel Rd, Suite 1100
Main Contact: Michael L. Johnson
Phone: 214-745-7070
Fax: Not Applicable
Email: michael@jma-johnson.com

BID METHOD:
Competitive Sealed Proposals